Consulting Engineers Project Managers Water Servicing Coordinators
Home
About us
Engineering & Hydraulics
Urban & Project
WSC
Contact us
Developer Information
First Name Middle Name
Surname
Company Name
ABN Phone No:
Mailing Address
Suburb
Post Code State NSW ACT VIC SA TAS WA QLD NT
Development Location
Street No
Street Name
Nearest Cross Street
Local Govt Area
DP Number(s) Lot Number(s)
Lot Status Developed Vacant
Describe Current Development
Proposed Development
Stage Number of
Stage Name
Subdivision Required Yes No
Total Dwellings
Total Lots (inc. Residue Lots)
Total Residue Lots
Consent Information
Consent Authority
Development Consent Number
Consent Date
Development Type
Commercial, Industrial, Community, Multi Unit & Special Uses
Expected Requirements for the proposed development
Water Demand
Maximum KL/Day Average KL/Day
Peak Demand: L/Day
Waste Water Discharge
Maximum: KL/Day Average KL/Day
Peak Simultaneous Discharge: L/Sec
Irrigation Systems Demand
Maximum L/Day Average L/Day
Peak L/Sec
Proposed Pattern of Usage:
Process Water Demand
Maximum: L/Day Average: L/Day
Peak Demand: L/Sec
Other Requirements
Air-Conditioning make-up water: L/Sec
Proposed Meter Size: mm
Any other relevant information affecting usage:
Fire Fighting Requirements
Fire Hose Reel: Number Fire Hydrant: L/Sec
Fire Sprinkler: L/Sec Wall Drencher: L/Sec
Work Description:
Services
Potable Water Waste Water Recycled Water Stormwater
Back to Top or Back to WSC Page
ãK.R.Stubbs & Associates Pty.Ltd